PCB Engineering ResourcesStackup | Trace spacing | Vias | Quality control

Stackup Design

PCB stackup design guide for manufacturing review.

A clear PCB stackup helps align routing, impedance, drilling, material selection and board thickness before production.

Layers

Layer planning

Define signal, plane and power layers with board thickness and material requirements.

Impedance

Controlled impedance

Trace geometry, dielectric thickness and copper weight should be coordinated with target impedance.

Manufacturing

Fabrication review

Stackup notes should match Gerber files, drill data and inspection expectations.

Engineering itemManufacturing reviewRelated page
FilesGerber, drill, outline, stackup and manufacturing notes.Required files
CapabilityLayer count, board thickness, copper, material and surface finish.Capabilities
QualityAOI, electrical testing, visual inspection and reliability review.Quality Control

Signal integrity and power planes

Signal layers

Signal layers should be arranged with clear reference planes when controlled impedance or high speed routing is required.

Power planes

Power and ground planes support stable return paths, lower noise and cleaner routing in multilayer PCB designs.

Material selection

Dielectric thickness, resin system, Tg and copper weight should be confirmed before manufacturing release.

Stackup FAQ

What PCB layer counts can you manufacture?

YBCPCB reviews 2-32 layer PCB projects based on stackup, material, thickness and drilling requirements.

What files are required for PCB manufacturing?

Gerber files, drill files, board outline, stackup notes, material requirements, surface finish, copper weight and inspection notes are recommended.

Do you support prototype and mass production?

Yes. Stackup review supports prototypes, small batches and mass production preparation.

Prepare your PCB project for engineering review.

Send manufacturing files, stackup details, material requirements and application notes.

Send Inquiry
Send Inquiry